NORTH

*** schedule file created on Andria's PC:
Matlab > testHeavyAnt

** this test was conducted with 
0) antenna under test: Leica AR25 chokering (serial??)
1) reference pier: Topcon CR-G5, S/N 762-10946
2) standard tracking loop settings for 689 PTU rx
3) last rx reset - 19 days ago with Septentrio
4) Javad receivers not contactable through NetHub
   (but possibly still logging data)


start of test
15 7 13 19 35 00
end of test
16 7 13 02 52 04 
duration: many many hours

files at start of test
SEPT196T.13_

files at end of test 
SEPT197C.13_

** RESULTS:
- antenna fell to 90 deg at some point during the test
- review of Position output file indicates PTU could
  recover from -2160 tilt (return to zenith) but that 
	subsequent tilts were unrecoverable
- need to confirm above using data


(standard):
  /par/raw/gdplls={band=3.0,order=1,guid=100}
  /par/raw/plls={band=3.0,order=1,guid=100}